Work continued today - a cut in the concrete floor was made in the new kitchen floor to install a new drainage pipe for the new sink/dishwashers. The old laundry room entry door and air conditioner were removed and framing is being installed to close up the openings.. The New Sink and New floor tile have been delivered
|